Central California Food Bank - North Canopy
Status
Accepting Bids
Prebid Date | 7/15/25 10:00am |
Bid Date | 8/12/25 2:00pm |
Company & Contacts
INVITATION TO BID
INTRODUCTION
Mark Wilson Construction (MWC) is inviting suppliers and subcontractors to submit bid proposals for the Central California Food Bank - North Canopy project. The project is located at 4010 E. Amendola Drive, CA 93725.
DESCRIPTION OF WORK
The project consists of a new building expansion to the existing Central California Food Bank North Canopy. Scope consists of tying into the existing building with electrical, low-voltage systems to include ERCES system, plumbing, HVAC, fire suppression system with design/build requirements and Fresno Fire Department approval. Additional scope includes selective demo, concrete, metal stud framing, rough carpentry, cabinetry, concrete unit masonry, sheet metal flashing and trim, hollow metal doors and frames, finish hardware, store front entrances, flooring, painting, frozen food refrigeration, elevator, and site work improvements.
Mandatory Pre-Bid Job Meeting Information
To be eligible to bid this project, the following subcontractors must attend at least one of the mandatory pre-bid job walks.
Mandatory for: Demo, Plumbing, Electrical, Fire Suppression, Earthwork & Paving, Concrete, HVAC, and Metal Stud Framing.
Job Walk #1: Tuesday, July 15, 2025 at 10:00 am at the jobsite, 4010 E. Amendola Drive, Fresno, CA 93725.
Job Walk #2: Tuesday, July 22, 2025, at 10:00 am at the jobsite, 4010 E. Amendola Drive, Fresno, CA 93725.
DURATION OF WORK
Time to Complete: 426 Calendar Days
Wage Scale: Prevailing Wage
Delivery Method: Negotiated GMP
Liquidated Damages: $500/day
Minority Goals: DVBE, DBE,WBE, SBE (BY MWC)
DIR Register: Yes