Kingsburg Elementary Charter School MPR HVAC Replacement
This project consists of HVAC Replacements for the Multi-Purpose Rooms (MPR) at Lincoln and Washington Elementary Schools. HVAC units are to be Contractor Furnished, Contractor Installed (CCFI).
    
    
    
    
    
    
    
            
                                                Lincoln
                
 (click to expand/collapse)
            
            
 (click to expand/collapse)
            | Name | Size | ||
| 2250.2_Lincoln_MPR_HVAC_Bid-Set | 8.5 MB | 
                                                Washington
                
 (click to expand/collapse)
            
            
 (click to expand/collapse)
            | Name | Size | ||
| 2250.1_Washington_MPR_HVAC_Bid-Set | 14.1 MB | 
    