Kingsburg Elementary Charter School MPR HVAC Replacement
This project consists of HVAC Replacements for the Multi-Purpose Rooms (MPR) at Lincoln and Washington Elementary Schools. HVAC units are to be Contractor Furnished, Contractor Installed (CCFI).
Lincoln
(click to expand/collapse)
Name | Size | ||
2250.2_Lincoln_MPR_HVAC_Bid-Set | 8.5 MB |
Washington
(click to expand/collapse)
Name | Size | ||
2250.1_Washington_MPR_HVAC_Bid-Set | 14.1 MB |