City Center 4-Story Tower

Status

Bidding Closed

Prebid Date4/13/22 10:00am

Bid Date5/25/22 2:00pm

Company

Mark Wilson Construction

Location

2025 E. Dakota Ave., Fresno, CA 93726

Description: The project consists of a proposed new four-story building totaling approximately 48,862 sq. ft. The work includes; concrete, wood building structure, metal framing, casework, prefinished metal siding, think brick veneer, aluminum eyebrow canopy, simulated wood siding, EIFS system, building insulation, single-ply roofing, prefinished aluminum flashing, sheet metal, metal fabrications, vinyl windows, hollow metal and laminate clad wood doors, storefront system, finish hardware, gypsum wallboard, painting, plumbing, mechanical, electrical, and fire protection systems.

Bid Date: 05/25/2022
Bid Time: 2:00 PM

Pre-Bid Meeting
1st Jobwalk 04/13/22 at 10am
2nd Jobwalk 04/20/22 at 10am

PBM Mandatory or Non-Mandatory: Mandatory for Demo, Earthwork, Site Utilities, Plumbing, and Electrical